Current Projects

Curran & Briggs Limited is able to carry out a diversified selection of work.  Displayed below are some of the projects that we have taken on this season.  Where photos are displayed click on the photo for a larger view, click on your browsers back button to return to this page. 

bullet Summerside BMX Park:  Contracted by The City Of Summerside this project will see C&B construct a two "bowl" BMX Park at the intersection of Willow St and Greenwood Drive.  Work will entail excavation, storm pipe installation, earthworks, concrete & asphalt work as well as landscaping.

Site Prior To Start-Up  Security Fencing & Stripping Top Soil  Site Staked Out & Excavation Starts  Excavation  Site Work

Checking Elevations  Bringing In The Gravel

bullet Charlottetown Pipe Work:   Curran & Briggs Limited has been contracted by The City of Charlottetown to conduct ditch infill along Countryview Drive, Regent Street, Lewis Point Road, Bardin Crescent, Abbey Drive and Richard Drive.  Street paving and landscaping to be completed as required.

Excavation  Site Work  Pipe Work

bullet Richmond Route 2 Road Construction:  Curran & Briggs Limited, contracted by the province of PEI's Transportation and Public Works to resurface roadway in Richmond on Route 2.  Work encompasses milling the existing road surface and re-surfacing with new asphalt and shoulder work.

Milling  Sweeping  Road Work  Skid Steer  Compaction 

Setting Up Paver  Starting a Fresh Mat  Joint fine Work  Fresh Blacktop Being Applied

bullet Empire Theaters "Studio 5" Parking Lot:  Contracted by Crombie Reit this project will see C&B milling and excavating a section of the current parking and re-building the excavated section to job specs.

Studio 5  Site Work  Milling & Excavation  Excavation  New Black Top 

bullet Woodridge Place, Summerside:  Curran & Briggs Limited, contracted by the owners of Woodridge Place will conduct site development to permit expansion of new lots.  Work to include site development, pipe work, and road infrastructure.

Site Development  New Lots & Road Work  Rough Grading  New Lots & Road  New Lot With Driveway  Compaction

bullet Stratford Sobeys Parking Lot:  Contracted by Crombie Reit this project will see C&B milling and excavating the current parking lot located on the front, side and rear of The Stratford Sobeys and re-building the parking lot to specs.

Stratford Sobeys  Excavation  Site Work

bullet Heritage Park Phase 3: Curran & Briggs Limited has been contracted by The City of Summerside to carry on with Phase 3 of the Heritage Park Project.  Work will include site development for washroom facilities, park lighting, walkways and landscaping.

 

bullet Springfield Route 2 Road Construction:  Curran & Briggs Limited is contracted by the province of PEI's Transportation and Public Works to remove and replace roadway at Springfield on Route 2.  Work encompasses removing the existing road surface, excavation and construction of a new road.

Trucking in Fill  Road Building  Milling  Sweeping

Asphalt Trucks Waiting To Unload  Seal Mat  Compaction

bullet Summerside Pipe Work:   Contracted by The City of Summerside this project will have Curran & Briggs Limited installing new water line and  residential hook-ups along Eustane Street and upper Arcona Street.  Street paving and landscaping to be completed as required.

Excavation  Trench Box

bullet Summerside Pump Stations:  Contracted by The City of Summerside this project will have Curran & Briggs Limited re-furbishing the Pump Stations on Northumberland and Eustane Streets.  Work will include upgrades to electrical services, incoming / outgoing lines as well as pumping equipment.  Street paving and landscaping to be completed as required.

Excavation  Site Work 

bullet Kensington (Barrett St):  Contracted by The Dept of Transportation and Infrastructure Renewal, C&B will conduct pipe work to upgrade the current storm lines as well as required road work.

Removing Old Line  Excavation  Forming for Sidewalks  Constructing Sidewalk

bullet Shorefront Protection:  Contracted by several cottage owners in Augustine Cove Curran & Briggs Limited is carrying out shorefront protection.  Work will include removing existing rock placing landscaping fabric to prevent erosion and replacing rock to further prevent erosion of the existing shorefront.

 

bullet Albany "Y" Road Construction:  Curran & Briggs Limited is contracted by the province of PEI's Transportation and Public Works to remove and replace approximately 783 meters of roadway at the Albany "Y".  Work encompasses removing the existing road surface, excavation and construction of a new road.

Road Prep  Excavation  Digging Down Old Road Surface  Loading Trucks 

Road Work  Fine Grading  Asphalt Work  Compaction  Asphalt Work

  Base Coat  Dumping Asphalt  Road Building  Paving Operation

bullet Community Connections Site Development:  Curran & Briggs Limited sub-contracted by T&K Home Improvement's is carrying out site development for the new Community Connections project off of Granville St behind the old Holland College Building.  Project will involve excavation / site preparation, installation of water service and sewer main service, driveway, parking lot and sidewalks.